Jump to content

Cabinets are being installed today


Dirtyhip

Recommended Posts



1 minute ago, Dirtyhip said:

I guess the cabs go in first, then flooring.  I would have thought it was the other way around.

The whitewash cabs are so pretty.  

Nope. cabs sit on bare floor.  too spensive to put nice flooring under cabinets.

  • Heart 4
Link to comment
Share on other sites

1 hour ago, Airehead said:

Pictures every day now, please

I will take some tonight.

Oh, this is cool... we have some professional trail builders that are arriving this weekend. They are bringing a mini excavator and some other equipment to help us build out the property.  They are here for professional reasons, and asked to stay on our property.  They said that they will help us with the jumpline and help to dial in the pump track.  It still needs a little fine tuning.  The jump line route is flagged and roughed in, but there are no jumps just yet.

  • Heart 1
  • Awesome 1
Link to comment
Share on other sites

4 hours ago, Dirtyhip said:

I think our garage door is coming in early now too. @ Scrapr is wronger on the July 4th deadline.  

I say June 20th

We need parameters here. House totally finished? Including punch list? Or are you moving in only partially done? Stove is back ordered, Bathroom faucet not working (installed) Wall gouges touch up done ....things like that

I'm pulling for ya

Link to comment
Share on other sites

34 minutes ago, Scrapr said:

We need parameters here. House totally finished? Including punch list? Or are you moving in only partially done? Stove is back ordered, Bathroom faucet not working (installed) Wall gouges touch up done ....things like that

I'm pulling for ya

I say livable home.  Little punch list fixes separate.

We have all the appliances.  I am moving in once we have floor, operational plumbing, and locking doors.  

Link to comment
Share on other sites

You're way ahead of me!

Supposedly the sheetrock is done by today and the contractor's interior design person, Kristi, said things go fast after that - but she wasn't figuring on all the delays in inspectors and permits.  The flooring isn't in yet and my refrigerator and washer/dryer are scheduled to be delivered on Friday - I may have to postpone that again.

I'm hopefully, no longer "surely," in the house before the end of June.

I'm moving from my apartment into a hotel suite Sun-Mon, having already moved a lot of stuff that I accumulated in the past year to my brother's house (bike, computer printer, winter clothes, etc. I won't move again until I'm in my house).  I'm cleaning out the refrigerator this evening and the bathroom tomorrow and I should have the apartment close to spotless when I leave.

  • Heart 1
Link to comment
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • Recently Browsing   0 members

    • No registered users viewing this page.
×
×
  • Create New...