Dottleshead ★ Posted April 2, 2021 Share #51 Posted April 2, 2021 4 hours ago, Bikeguy said: Not sure about that... wasn't the original completion date in October?? That would be at least 3 months past the due date. We'll see if Mick or DH go more than 3 months past the due date. True day. I say @MickinMD Has more chance for delay because of the covid factor. People in KF are more right wingers. Link to comment Share on other sites More sharing options...
Further Posted April 2, 2021 Share #52 Posted April 2, 2021 3 minutes ago, Dottles said: True day. I say @MickinMD Has more chance for delay because of the covid factor. People in KF are more right wingers. Hey Dottie, How are you liking the new homeplace ? Link to comment Share on other sites More sharing options...
Dottleshead ★ Posted April 2, 2021 Share #53 Posted April 2, 2021 8 minutes ago, Further said: Hey Dottie, How are you liking the new homeplace ? We love it. Thank you for asking. Surprised with how folks respond.... particularly the older folks. 3 Link to comment Share on other sites More sharing options...
sheep_herder ★ Posted April 3, 2021 Share #54 Posted April 3, 2021 13 hours ago, Dottles said: We love it. Thank you for asking. Surprised with how folks respond.... particularly the older folks. Link to comment Share on other sites More sharing options...
Dirtyhip Posted May 27, 2021 Author Share #55 Posted May 27, 2021 Little bump to keep the game alive. I think I have pulled out into the lead position. 1 Link to comment Share on other sites More sharing options...
Airehead Posted May 27, 2021 Share #56 Posted May 27, 2021 21 minutes ago, Dirtyhip said: Little bump to keep the game alive. I think I have pulled out into the lead position. Me too Link to comment Share on other sites More sharing options...
Dirtyhip Posted June 7, 2021 Author Share #57 Posted June 7, 2021 Bump for vote checkup 1 Link to comment Share on other sites More sharing options...
jsharr ★ Posted June 7, 2021 Share #58 Posted June 7, 2021 Link to comment Share on other sites More sharing options...
Airehead Posted June 8, 2021 Share #59 Posted June 8, 2021 I still think DH Link to comment Share on other sites More sharing options...
Dirtyhip Posted June 8, 2021 Author Share #60 Posted June 8, 2021 We got more electrical today. Looks almost complete for that. Need my undercab lights installed. Need plumbing finished. So close now. 1 Link to comment Share on other sites More sharing options...
Airehead Posted June 8, 2021 Share #61 Posted June 8, 2021 9 hours ago, Dirtyhip said: We got more electrical today. Looks almost complete for that. Need my undercab lights installed. Need plumbing finished. So close now. When do they predict that your house will be done? Link to comment Share on other sites More sharing options...
MickinMD ★ Posted June 8, 2021 Share #62 Posted June 8, 2021 My contractor is still hoping he'll be done and I'll be in by the end of June. The flooring is not done, the wiring is done but no electrical outlets, etc. installed. The plumbing connections to the washer/dryer closet are there and new outdoor water faucets are there, but I don't know how much other plumbing has been done. The furnace and central air conditioner are not in. The bathtub is installed but nothing else in the bathroom. The sheetrock, doors and windows are all up and all painted, the cabinets are in. The refrigerator and washer/dryer have been delivered. I've been delaying putting in my choices for gas range, above range microwave, and dishwasher because I've been hoping for new stuff to appear, but that didn't happen and I expect to put my list (4-5 of each, hoping one is available) tomorrow. The contractor's interior expert said, "Things go fast after the sheetrock is up," but that was before major delays in getting inspectors out to the house, weeks instead of next-day, began. The additional roof extension I paid $7000+ for over the basement steps has not been done and "it goes on a seperate permit" which probably means it will be done after I'm back in the house. The refrigerator goes in the space at right, leaving an 8" space to put brooms, etc. The dishwasher goes in the empty space at left. The gas range and microwave go to the left of the dishwasher. The washer/dryer (pic below) go in this closet, which is on the left of the wall opposite where the refrigerator goes above. The kitchen opens out to this porch - the little bit of wall on the left is the right wall of the washer/dryer closet above. There is an exterior door separating the kitchen from the porch, but I'll use some of it it as a storage extension of the kitchen and maybe remove that door's hinge pins during part of the year. Link to comment Share on other sites More sharing options...
Dirtyhip Posted June 8, 2021 Author Share #63 Posted June 8, 2021 1 hour ago, Airehead said: When do they predict that your house will be done? They never give dates. It is more like, Well, once the counter tops are in, final plumbing can be done... Dates they predicted are long gone behind us. Link to comment Share on other sites More sharing options...
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now